If you're seeing this message, that means
JavaScript has been disabled on your browser
, please
enable JS
to make this app work.
Stronger Together - FleetPride and TruckPro Announce Strategic Partnership.
Close
Search
Search
SIGN IN
SIGN IN
Private List
(0)
Shopping cart, 0 Items
Skip to Main Content
TRUCK & TRAILER PARTS
Accessories and Fluids
Air and Fuel Delivery
Auxilliary Power
Belts and Cooling
Body
Brake
Driveline and Axles
Electrical, Charging and Starting
Electrical, Lighting and Body
Emission Control
Engine
Entertainment and Telematics
Exhaust
Hardware and Service Supplies
Household, Shop and Office Products
HVAC
Ignition
Miscellaneous
Multifunction Terms
Oil
Steering
Suspension
Tire and Wheel
Tools and Equipment
TP Auxiliary Power
Transfer Case
Transmission
Wiper and Washer
SERVICES
LOCATIONS
RESOURCES
CREATE ACCOUNT
CONTACT US
Your store: 219EC900
Harrisburg, PA 17104
717-939-7873
Home
TRUCK & TRAILER PARTS
Suspension
Hardware, Fasteners and Fittings
Haldex Electronic Control Unit A7 Long Lead For Anti Lock Brake
Zoom in
Zoom out
Haldex Electronic Control Unit A7 Long Lead For Anti Lock Brake
TruckPro Item #:
MDAL919340
Vendor Part #:
AL919340
You saved $1.00
Price:
$493.
29
(each)
Add to list
Closest Inventory
Availability
Inventory Loading ...
Add to cart
Product Description
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Product Detail & Specification
Specifications
Part Name:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Brand:
Haldex
Short Description:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Part Number:
MDAL919340
Vendor Part Number:
AL919340
Height:
12.001
Width:
12.001
Length:
12.001
Weight:
1.16
Parts Classification:
Parts Classification>>Suspension>>Hardware, Fasteners and Fittings>>Shock Absorber Sleeve (51655)
Bar Code:
767653333311
Unit of Measure:
EACH
LTL Required:
false
Length of Warranty (Months):
12
NMFC Code:
121875-NULL-70|MISCELLANEOUS TRUCK PARTS, includes Transmission/Clutch Parts, Gears, Pumps, etc
Cross References
Warranty
For warranty details, see the
Warranty Claims
section.
Live chat:
Agent Offline