Haldex Electronic Control Unit A7 Long Lead For Anti Lock Brake

TruckPro Item #: MDAL919340
Vendor Part #: AL919340
You saved $1.00
Price:
$493.29(each)
Availability
Inventory Loading ...

Product Description

Electronic Control Unit A7 Long Lead For Anti Lock Brake

Product Detail & Specification

Specifications

Part Name:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Brand:
Haldex
Short Description:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Part Number:
MDAL919340
Vendor Part Number:
AL919340
Height:
12.001
Width:
12.001
Length:
12.001
Weight:
1.16
Parts Classification:
Parts Classification>>Suspension>>Hardware, Fasteners and Fittings>>Shock Absorber Sleeve (51655)
Bar Code:
767653333311
Unit of Measure:
EACH
LTL Required:
false
Length of Warranty (Months):
12
NMFC Code:
121875-NULL-70|MISCELLANEOUS TRUCK PARTS, includes Transmission/Clutch Parts, Gears, Pumps, etc

Cross References

Warranty