Put it in the Search Bar! Access to Over 4 Million Parts Listings.

Haldex Electronic Control Unit A7 Long Lead For Anti Lock Brake

TruckPro Item #: MDAL919340
Vendor Part #: AL919340
You saved $1.00
Price:
$489.49(each)
Availability
Inventory Loading ...

Product Description

Electronic Control Unit A7 Long Lead For Anti Lock Brake

Product Detail & Specification

Specifications

Description:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Part Name:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Brand:
Haldex
Short Description:
Electronic Control Unit A7 Long Lead For Anti Lock Brake
Part Number:
MDAL919340
Vendor Part Number:
AL919340
Height:
12.001
Width:
12.001
Length:
12.001
Weight:
1.16
Parts Classification:
Parts Classification>>Suspension>>Hardware, Fasteners and Fittings>>Shock Absorber Sleeve (51655)
Unit of Measure:
EACH
LTL Required:
false
Length of Warranty (Months):
12
Bar Code:
767653333311
NMFC Code:
121875-NULL-70|MISCELLANEOUS TRUCK PARTS, includes Transmission/Clutch Parts, Gears, Pumps, etc

Cross References

Warranty

Recently viewed items

    SKF Seal 486474
    TruckPro Part #: CR9795
    Vendor Part #: 9795
    Sign In For Pricing

    Lowest rated $0.00% off

    Inventory Loading ...
      K-Tool International PLASTIC ROTARY 1276812
      TruckPro Part #: WBKTI72204
      Vendor Part #: KTI72204
      Sign In For Pricing

      Lowest rated $0.00% off

      Inventory Loading ...
        OSLO V3
        TruckPro Part #: LA55-902
        Vendor Part #: 55-902
        Sign In For Pricing

        Lowest rated $0.00% off

        Inventory Loading ...
          OSLO V3
          TruckPro Part #: LRHDC010051SK
          Vendor Part #: HDC010051SK
          Sign In For Pricing

          Lowest rated $0.00% off

          Inventory Loading ...